Call us on
+44 (0)1268 777871Case studies
You can search case studies either by application or the product used.
Most recent case studies
The Co-op, Ambleside
27 November 2025
The Co-op at Ambleside was suffering from roof leaks caused by the existing felt roof starting to come to the end of its design life. Proteus was asked to...
The Memorial Hall, Bearsted
24 November 2025
Located in the rural village of Bearsted, The Memorial Hall is at the heart of the
local community, being used by over 400 people each week.
Newington Community Primary School, Kent
24 November 2025
Based in Ramsgate, Kent, Newington Community Primary School accommodates children from nursery age up to year 6.
Scottow Enterprise Park
24 November 2025
Scottow Enterprise Park is a 600-acre site based on the former RAF Coltishall, offering a wide range of tenancy opportunities and film location hire.
Dane Court Grammar School, Broadstairs
21 November 2025
Based in Broadstairs, Dane Court Grammar School accommodates children from 11 to 19 years of age across both senior school and sixth-form setting. Proteus...
The Grange, Sevenoaks, Kent
17 November 2025
Project Overview
Located in Sevenoaks, Kent, this residential property required a thermal upgrade and a new long term waterproofing solution. Proteus...