Logo

Most recent case studies

St George’s House, Wimbledon

12 December 2025

The parking facilities at a Grade A office block in Wimbledon were in need of refurbishment due to severe water ingress from the ground level car park into the...

DoubleTree Hilton Hotel, Rotherhithe

12 December 2025

DoubleTree Hilton Hotel located on the River Thames required refurbishment works to the courtyard areas, due to water ingress into the rooms below. The client...

Bristol Hippodrome

12 December 2025

Located in the centre of Bristol and home to one of Britain’s largest theatre stages, Bristol Hippodrome is a hub for many major musical productions. The...

Kaber Court

08 December 2025

Kaber Court, a multi-residential building in Liverpool, was experiencing significant issues with its existing roof system. The original membrane had become...

St Catherines Court

08 December 2025

St Catherines Court, a residential block, required a new waterproofing solution that would bring the building up to current Part B (fire safety) and Part L...

The Co-op, Ambleside

27 November 2025

The Co-op at Ambleside was suffering from roof leaks caused by the existing felt roof starting to come to the end of its design life. Proteus was asked to...

Top