Call us on
+44 (0)1268 777871Case studies
You can search case studies either by application or the product used.
Most recent case studies
Fire Service College
22 April 2026
After being approached by its Approved Contractor, Proteus Waterproofing® carried out a detailed roof survey and provided a bespoke specification for roof...
New build roof, Litherland High School, Liverpool
22 April 2026
With the major failure of a new school roof due to high winds uplifting the roof system away from the metal structural deck, Litherland High School in...
Riddings Junior School, Derby
22 April 2026
Riddings Junior School had a problem with the flat roof above the kitchen area
Longford Park Primary School, Banbury, Oxfordshire
22 April 2026
Longford Park Primary School consists of a number of separate flat roofs making up circa 2,500m2 .
London Museum, Smithfield
13 April 2026
The new London Museum project in Smithfield, being delivered by Sir Robert McAlpine, is transforming the historic Victorian General Market and Poultry Market...
Park Tower Hotel, Knightsbridge
09 April 2026
The ground floor and podium deck to this new build hotel required waterproofing and insulating. Proteus Cold-Melt®, a cold applied reinforced liquid...