You can search case studies either by application or the product used.
Most recent case studies
West Cumberland Hospital
12 December 2025
As part of a major redevelopment programme at West Cumberland Hospital – encompassing upgrades to internal ward blocks and improvements to the building...
St George’s House, Wimbledon
12 December 2025
The parking facilities at a Grade A office block in Wimbledon were in need of refurbishment due to severe water ingress from the ground level car park into the...
DoubleTree Hilton Hotel, Rotherhithe
12 December 2025
DoubleTree Hilton Hotel located on the River Thames required refurbishment works to the courtyard areas, due to water ingress into the rooms below. The client...
Bristol Hippodrome
12 December 2025
Located in the centre of Bristol and home to one of Britain’s largest theatre stages, Bristol Hippodrome is a hub for many major musical productions. The...
Kaber Court
08 December 2025
Kaber Court, a multi-residential building in Liverpool, was experiencing significant issues with its existing roof system. The original membrane had become...
St Catherines Court
08 December 2025
St Catherines Court, a residential block, required a new waterproofing solution that would bring the building up to current Part B (fire safety) and Part L...