The Mall, Walthamstow

Following a large fire that affected the whole shopping mall, a major part of the refurbishment works involved the remodelling of the architectural pyramids on the roof,converting them into a flat roof that would be compliant with current Building Regulations.

Product brief:

Proteus Waterproofing were asked to supply a high-performance solution which would upgrade the drainage falls with a new Proteus Pro-Therm Insulation Cut to Fall Tapered Scheme, designed to comply with Building Regulations Part L (thermal).

Key Requirements: High Performance Waterproofing

The existing fire and water damaged roof had to be removedto enable the metal roof deck to be inspected and repaired as required. Proteus Waterproofing worked closely with the Proteus Approved Contractor to ensure works were completed to a high standard.

Key Requirements: Health & Safety

When working in public areas, safety is always of the utmost importance. Proteus Pro-FeltĀ® Ultima Plus BUR system incorporates a cold installed, self-adhesive air vapour control which is bonded to the metal roof deck. Proteus Pro-Therm Cut to Fall Tapered Insulation is cold bonded to the air vapour control making it ideal to use on public buildings as the risks to operatives and members of the public are greatly reduced. All Proteus Waterproofing specifications promote fire safe installation methods conforming to the industry lead Safe2Torch guidelines.

Key Requirements: Long Term Performance

Proteus Pro-FeltĀ® Ultima Plus BUR offers a durable waterproofing and protection solution for new build and refurbishment projects, and is BBA Certified.


Talk to An Expert

What is your area of interest?
  •   
  •   
  •   
  •   
  •   
  •   
  •   
Top