Logo
  •  

Located in the affluent area of Wimbledon, Southwest London, The Priory Church of England Primary School required the expertise of Proteus Waterproofing®.

We were asked to carry out inspections of all roof areas and put forward recommendations for long term waterproofing solutions.


Key Challenges & Solutions
•    Minimal disruption: Due to the building works taking place during school term time, the project required minimal disruption to the pupils’ studies and staff working environment. The Proteus Pro-Felt® Endura system provided by Proteus Waterproofing® overcame this challenge, allowing the school to operate normally.
•    Budget requirements: Due to previous repair costs, the budget available for the works was tight. The Proteus offer meant we were able to keep the project on budget whilst still providing a waterproofing finish that met the project requirements.
•    Challenging details: There were numerous obstacles across the roof including clerestory windows, heat pump pipework, rooflights and vents – all of which required specific details to provide sufficient termination. Using our experience and knowledge, we provided suitable options including the use of our Pro-BW® Plus system for terminating around pipes penetrating through upstands and vertically around vents. Regular site visits by our technicians ensured that all terminations were carried out correctly.


Conclusion
Proteus Waterproofing® provided a long-term insulation and waterproofing solution. The project was delivered with minimal disruption to the school’s working environment, whilst adhering to their tight budget and meeting the projects requirements.
 

Talk to an expert today!

Top